CCH4TENNIS,
I am estimating that I would need roughly 4, 4" strips of 1/4" lead tape at the 3 and 9 o'clock positions. My main goal would be to increase the swingweight up to 330-335 (strung), and I prefer to add the weight at 3 and 9 o'clock for increased torsional stability, as opposed to adding it at 12 o'clock.
Troy, TW
|