Currently I use the mini Jet and I do not understand how to do the full Jet. Here it is
MAIN STRINGS :
1. String first four center mains on each side at reference tension.
2. Next 2 (on 16 mains) or 3 (on 18 mains) reduce tension by 4 pounds.
3. On a 16 main pattern after pulling main #6 skip over to #8. Increase tension 4 pounds (to reference tension) before tensioning. (#8 will be pulled at reference tension). On an 18 main pattern after pulling #7 skip over to #9. Increase tension 4 pounds before tensioning.
4. Fill-in main #7 (on a 16 main or #8 on an 18 main) which will be the last main. Adjust tension by adding an additional 4 pounds (reference plus 4.)
5. Tie off on main #6 (16 main) or #7 (18 main).
CROSS STRINGS :
1. IMPORTANT: Each cross string must be held under tension at least 20 seconds before clamping off. We recommend weaving the next cross while the previous one remains under tension.
2. Start first three cross strings and tension at same tension as final mains. (+4 over reference tension)
3. After installing 3rd cross string, reduce tension 6 pounds and install the rest of the cross strings (This will be reference – 2)
4. After stringing 3rd last cross, loop over and weave final cross. Increase tension +6 pounds.
5. For last cross string fill in second from bottom. Tie off on 3rd from bottom.
So, if I am stringing two piece at 44lbs in a 16X20 is this correct:
Mains
M1-4 at 44
5,6 at 40
now skip 7 and string 8 at 44
Go back and string 7 at 48
Tie off mains at 6
Cross
C1-3 at 48
C4-17 at 42
Now string 20 at ?
Go back to 19 and String at ?
tie off 3rd from bottom
Also can anyone explain how do do a hybrid with the full Jet when I want to string 44 Mains and 42 Crosses?
MAIN STRINGS :
1. String first four center mains on each side at reference tension.
2. Next 2 (on 16 mains) or 3 (on 18 mains) reduce tension by 4 pounds.
3. On a 16 main pattern after pulling main #6 skip over to #8. Increase tension 4 pounds (to reference tension) before tensioning. (#8 will be pulled at reference tension). On an 18 main pattern after pulling #7 skip over to #9. Increase tension 4 pounds before tensioning.
4. Fill-in main #7 (on a 16 main or #8 on an 18 main) which will be the last main. Adjust tension by adding an additional 4 pounds (reference plus 4.)
5. Tie off on main #6 (16 main) or #7 (18 main).
CROSS STRINGS :
1. IMPORTANT: Each cross string must be held under tension at least 20 seconds before clamping off. We recommend weaving the next cross while the previous one remains under tension.
2. Start first three cross strings and tension at same tension as final mains. (+4 over reference tension)
3. After installing 3rd cross string, reduce tension 6 pounds and install the rest of the cross strings (This will be reference – 2)
4. After stringing 3rd last cross, loop over and weave final cross. Increase tension +6 pounds.
5. For last cross string fill in second from bottom. Tie off on 3rd from bottom.
So, if I am stringing two piece at 44lbs in a 16X20 is this correct:
Mains
M1-4 at 44
5,6 at 40
now skip 7 and string 8 at 44
Go back and string 7 at 48
Tie off mains at 6
Cross
C1-3 at 48
C4-17 at 42
Now string 20 at ?
Go back to 19 and String at ?
tie off 3rd from bottom
Also can anyone explain how do do a hybrid with the full Jet when I want to string 44 Mains and 42 Crosses?