So I am now getting a lot of rackets thrown my way for stringing. I am stringing appx 8-12 rackets per week, and the trend seems to be staying. It takes me appx 45-50 mins to do a complete string job on my Gamma Progression with fixed clamps and with a Wise 2086 head. When I say complete string job I mean these stages:
(1) Inspect racket
(2) Make a note of the tie off points and which holes to skip etc
(3) Remove old strings
(4) Clean racket frame
(5) Measure out the new string
(6) Mount racket to machine
(7) String the racket the 2 piece method
(8) Remove racket from machine, inspect & straighten the crosses if needed
(9) Stencil the strings.
Is my complete job time of 45-50 mins acceptable for all the above or can it be drastically reduced? Any hints or tips are most welcome.
(1) Inspect racket
(2) Make a note of the tie off points and which holes to skip etc
(3) Remove old strings
(4) Clean racket frame
(5) Measure out the new string
(6) Mount racket to machine
(7) String the racket the 2 piece method
(8) Remove racket from machine, inspect & straighten the crosses if needed
(9) Stencil the strings.